...the who's who,
and the what's what 
of the space industry

Space Careers

news Space News

Search News Archive

Title

Article text

Keyword

  • Home
  • News
  • NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages

Written by  Thursday, 18 September 2025 07:25
Los Angeles CA (SPX) Sep 17, 2025
NASA's Dragonfly mission has successfully cleared several major design, development, and testing milestones, keeping it on track for launch in July 2028. Dragonfly, a nuclear-powered, car-sized rotorcraft built at Johns Hopkins Applied Physics Laboratory (APL), will journey to Saturn's moon Titan to conduct a three-year exploration of its surface. Following a six-year cruise, the aircraft
NASA Dragonfly Mission Advances Through Crucial Development and Testing Stages
by Clarence Oxford
Los Angeles CA (SPX) Sep 17, 2025

NASA's Dragonfly mission has successfully cleared several major design, development, and testing milestones, keeping it on track for launch in July 2028.

Dragonfly, a nuclear-powered, car-sized rotorcraft built at Johns Hopkins Applied Physics Laboratory (APL), will journey to Saturn's moon Titan to conduct a three-year exploration of its surface. Following a six-year cruise, the aircraft will fly between diverse landing sites, carrying instruments designed to probe Titan's habitability and search for the chemical precursors of life.

"The components of the rotorcraft lander are being built as scientists and engineers transform this bold exploration idea into reality," explained Elizabeth "Zibi" Turtle, Dragonfly principal investigator at APL. She noted that cleanroom work, wind tunnel trials, and critical system tests are all feeding into the next stages of development.

Recent activities include rotor performance tests at NASA Langley's Transonic Dynamics Tunnel, where engineers studied stresses, vibrations, and aeromechanics under Titan-like atmospheric conditions. These data will inform Dragonfly's navigation and flight software.

Meanwhile, NASA Goddard scientists completed a core element of the Dragonfly Mass Spectrometer (DraMS), the Ion Trap Mass Spectrometer, which will identify Titan's chemical composition. The device has cleared acceptance review and is now being prepared for space-environment testing.

Thermal protection work has also advanced. APL engineers validated the lander's Solimide-based foam insulation, designed to endure Titan's -300 F (-185 C) conditions. Structural and thermal trials confirmed that the 3-inch-thick layer will safeguard instruments and systems.

On the communications front, APL delivered the Frontier radios, compact software-defined devices capable of handling deep-space telecommunications with lower power demands. These radios have a proven record across multiple NASA missions.

Lockheed Martin teams in Denver advanced construction of Dragonfly's aeroshell, completing fabrication and thermal testing of its heatshield and backshell. These components will protect the craft during Titan's intense atmospheric entry.

With integration and test activities beginning in January 2026, Dragonfly is set to launch aboard a SpaceX Falcon Heavy rocket from NASA's Kennedy Space Center in Florida.

Related Links
Dragonfly
Explore The Ring World of Saturn and her moons
Jupiter and its Moons
The million outer planets of a star called Sol
News Flash at Mercury


Read more from original source...

Interested in Space?

Hit the buttons below to follow us...