Print this page

Orion Star Trackers, Reaction Control Thrusters Tested: Artemis I Flight Day 12

Written by  Monday, 28 November 2022 10:54
Write a comment
Houston TX (SPX) Nov 28, 2022
On the 12th day of the Artemis I mission, team members conducted another planned test of the star trackers aboard Orion as it continued along a distant retrograde orbit of the Moon, and began another reaction control thruster flight test. Engineers hope to characterize the alignment between the star trackers and the Orion inertial measurements units, both of which are part of the guidance,

On the 12th day of the Artemis I mission, team members conducted another planned test of the star trackers aboard Orion as it continued along a distant retrograde orbit of the Moon, and began another reaction control thruster flight test.

Engineers hope to characterize the alignment between the star trackers and the Orion inertial measurements units, both of which are part of the guidance, navigation and control system, by exposing different areas of the spacecraft to the Sun and activating the star trackers in different thermal states.

Star trackers are navigation tools that measure the positions of stars to help the spacecraft determine its orientation. The inertial measurement units contain three devices, called gyros, used to measure spacecraft body rotation rates, and three accelerometers used to measure spacecraft accelerations.

Together, the star tracker and inertial measurement unit data are used by Orion's vehicle management computers to compute spacecraft position, velocity, and attitude. The measurements will help engineers understand how thermal states affect the accuracy of the navigation state, which ultimately affects the amount of propellant needed for spacecraft maneuvers. Read more about Orion's guidance, navigation, and control system in the Artemis I reference guide.

Engineers began a development flight test objective today that changed the minimum jet firing time for the reaction control thrusters over a period of 24 hours. This test objective is designed to exercise the reaction control system jets in a different configuration to model how thruster jets will be used for the crewed Artemis II mission.

Teams also activated and interacted with the Callisto payload, a technology demonstration from Lockheed Martin in collaboration with Amazon and Cisco. Callisto is located in the Orion cabin and will test voice activated and video technology in the deep space environment.

Monday, Nov. 28, Orion will reach its farthest distance from Earth when it is nearly 270,000 miles from our home planet.

As of 4:30 p.m. CST, Orion was over 264,000 miles from Earth and 45,600 miles from the Moon, cruising at 1,750 miles per hour.


Related Links
Artemis
Mars News and Information at MarsDaily.com
Lunar Dreams and more

Tweet

Thanks for being here;
We need your help. The SpaceDaily news network continues to grow but revenues have never been harder to maintain.

With the rise of Ad Blockers, and Facebook - our traditional revenue sources via quality network advertising continues to decline. And unlike so many other news sites, we don't have a paywall - with those annoying usernames and passwords.

Our news coverage takes time and effort to publish 365 days a year.

If you find our news sites informative and useful then please consider becoming a regular supporter or for now make a one off contribution.

SpaceDaily Contributor
$5 Billed Once

credit card or paypal

SpaceDaily Monthly Supporter
$5 Billed Monthly

paypal only



MOON DAILY
European Service Module powering Orion to the Moon and back
Paris (ESA) Nov 24, 2022
The European Service Module is powering Orion around the Moon and back, providing propulsion, temperature control, electricity as well as storage and delivery for essential supplies such as fuel, water and air. This first Artemis mission is an uncrewed test mission, putting the spacecraft through its paces preparing to send astronauts forward to the Moon. After liftoff at 07:47 CET (06:47 GMT, 01:47 local time) on 16 November, the European Service Module unfolded its 7-m solar wings to start gener ... read more


Read more from original source...

You must login to post a comment.
Loading comment... The comment will be refreshed after 00:00.

Be the first to comment.